November
2003
- Installation and comission of the
three new Multisimplex system at Fortum, Högdalen verket, completed.
- Grabitech has redesigned the
sanderdust injection system at Great Lakes MDF, LLC in Buffalo, USA. The
modification of the system has resulted in a significant increase in the overall
yield of the plant. Grabitech has installed a new server for data collection
using Wonderware INSQL 8.0 and Active Factory 8.0.
|